•   ABOUT US
    • Who We Are
    • Message from Managenemt
    • Management and Organization
    • Core Values
    • Mission & Vision
    • Our Commitments
    • Code of Business Ethics
    VinkaOG
  • SERVICES
    • What We Supply
    •     Engineering
    •     Project Management Consultancy
    •     Specialized Engineering Studies
    •     Safety & Environmental
    • Business Sectors
  • SUSTAINABILITY
  • PROJECTS
  • MEDIA
    • Project Announcements
    • Newspaper Editorials
    • Events
    •  Image Gallery
    •  Video Gallery
    •  Downloads
  • CAREERS
    • Why Choose Us
    • Job Openings
  • CONTACT
    • Our Locations
    • Contact Us
  •   ABOUT US
    • Who We Are
    • Message from Managenemt
    • Management and Organization
    • Core Values
    • Mission & Vision
    • Our Commitments
    • Code of Business Ethics
    VinkaOG
  • SERVICES
    • What We Supply
    •     Engineering
    •     Project Management Consultancy
    •     Specialized Engineering Studies
    •     Safety & Environmental
    • Business Sectors
  • SUSTAINABILITY
  • PROJECTS
  • MEDIA
    • Project Announcements
    • Newspaper Editorials
    • Events
    •  Image Gallery
    •  Video Gallery
    •  Downloads
  • CAREERS
    • Why Choose Us
    • Job Openings
    • Application Form
  • CONTACT
    • Our Locations
    • Contact Us

Fujairah Oil Terminal

Image

Client

Fujairah Oil Terminal FZC (JV Concord Energy & Sinopec)

Location

Fujairah, United Arab Emirates

Status

Stage 1: Completed 2014
Stage 2: Completed 2016
Stage 3: FEED Completed 2016

Services

- Frond End Engineering Design (FEED)
- Environmental Impact Assessment (EIA)
- Project Management Consultancy (PMC)

Project Description

FOT is one of the most prestigious and strategic storage terminal projects in Fujairah, the fastest growing oil storage and trade hub in the world.

The facility is a world class 1.177 million m3 oil storage facility designed to store a range of White and Black Petroleum Products in addition to Crude Oil. A new Tank-farm dedicated for Gas Oil was added in the same Tank Terminal in 2016. In addition to storage tanks, the terminal will offer multiple services including loading & discharge of vessels including VLCC and blending operations. The project will be constructed in two phases.


Vinka Oil & Gas Updates

Our Recent Projects


Copyrights 2024 © Vinka Oil & Gas  |  Disclaimer  |  Privacy Policy  |  Terms & Conditions  |  Sitemap  |  Contact Us  |